Renew your floor without breaking anything

The placement of the new floor can be done by means of collages on the old floor and avoid drastic and delayed reforms

Are you tired of the flooring in some room in your home? With the constant abuse of the furniture drag, sun exposure, heat, friction with brooms and even the accumulated wear of the floor over it, the floors inevitably suffer. The damage accumulated over the years is often irreversible or is so severe that it is not worth the repair, especially if it is of less noble materials.

Just thinking about replacing it, however, we already have a headache. The noise and the amount of dust generated by the break-breaking removal of the old floor is a huge inconvenience. Moreover, it is a time-consuming and expensive work. Eid Mubarak Shayari But calm down! It does not have to be this way.

Currently, there are materials that can be applied directly on the old floor. In this way, all the work of removing the original finish from the floor is avoided. What remains is quick work, with less clutter, silent, and even more so. Know the technique of floor on the floor!

How does it work?

The technique consists of applying a new coating layer directly onto the existing flooring in place. It is made possible by special mortar paste. They are much stronger and also have faster drying than the common ones. Therefore, they are more expensive than conventional ones. Even so, the generated economy pays the difference with enough time.

Where is it possible to apply?

There are floors and mortars for both internal and external areas. There are those who say that this technique should not be applied in kitchens and areas constantly washed, by the risk of infiltration and detachment. In fact, these problems only occur if an incorrect application of the floor is made. Proof of this is the fact that large commercial sites, such as malls and galleries, make use of this type of floor, to avoid being closed for retirement for long. Probably the floor of your kitchen suffers less abuse than the floor of a mall.

How is the application made?

The site needs to be evaluated to locate unevenness and lose boards. Good Morning Images. These problems must be corrected prior to application so that they are not transmitted to the new finish. The surface is then thoroughly washed away, removing any contaminants that may disrupt adhesion. Next, apply the correct adhesive mortar and lay the new floor on top using spacers to maintain uniform distribution. The first cleaning is done before the mortar dries, still by the installer, so that no residue is left on the new floor. The whole process takes around one working day per environment. In 3 or 4 hours the mortar is already dry and you can step on the new floor without problems in 24 hours.

What are the pros and cons?

The great advantage is the ease of installation. No debris is generated at all (only scraps that have been cut to close corners are thrown away), it does little dirt, and very little money is spent on both the materials and the workmanship. So with little time and money the environment is on a new face!

The main problem is that your floor will be raised by a few millimeters. A slim, thinner finish makes this difference even smaller. The floor elevation does not bring any nuisance to the residents but may interfere with the opening of doors. In this case, the doors must be removed, adjusted and reinstalled. It is not a complicated or costly process, but it is a drawback.

If installed without proper care, the floors can last little and leave the bad finish around drains, plugs, corners and against the wall. This, however, is easily avoidable if hired a specialized professional for the installation.

A brand new floor is a lot easier than you might think. With these care and help from an experienced professional, the only headache you may have is being able to choose the most beautiful among the dozens of models available in the market!

Leave a comment

Your email address will not be published. Required fields are marked *